WSC to Provide BWP with Annual Update of the 3KEYMASTER Environment, Tools, and DCS for the Magnolia Power Plant Training Simulator

The Power Production Division of the Burbank Water and Power (BWP) Department has renewed time and material support and updates with WSC, as well as 3KEYMASTER Consortium membership, in support of the Magnolia Power Plant (MPP) training simulator.

 

WSC will:


- Update the 3KEYMASTER Environment and Modeling Tools to the latest version.

- Incorporate changes to the MPP training simulator resulting from changes to the Plant version of the BWP Virtual DCS systems (Mark VIe and DeltaV).

- Perform any tuning or updates to the models, as needed.

- Provide general model maintenance support.

- Provide Site Acceptance Test to verify the performance of the simulator with the new data.