Update The Duke Energy Buck Station 2x1 Combined Cycle Simulator was declared Ready for Training in October 2014. Duke Energy awarded WSC a contract to provide a full scope simulator for the 620 MW Buck Station 2x1 Combined Cycle Station. The high fidelity models will simulate two GE 7FA combustion turbines with a GE Mark VI Virtual DCS, two Vogt triple pressure Heat Recovery Steam Generators (HRSGs) and one GE D11 steam turbine-generator, also with a GE Mark VI Virtual DCS and all necessary auxiliary systems. Overall control of the combined-cycle plants is through a virtual Westinghouse Ovation DCS. WSC is also providing our state of the art 3KEYMASTER Instructor Station and a custom control room operator console, which supports the numerous operator HMI LCDs.